Real document

Reading a revised project quotation: compare versions, exclusions and optional costs

Reading a revised project quotation means comparing scope as well as price. Check two versions, optional costs, exclusions and approval status.

In short

Compare what is included, excluded and conditional before comparing the totals of two quotations. Revised means changed; a higher total can cover more work, while an optional item may still sit outside that total.

Yellow the idea to rememberBlue English to learnRed watch out

Moss Design Studio

Community noticeboard project - quotation comparison

Version 1 - Monday

Base work: design one A2 noticeboard panel and supply a print-ready file. Price: £240. One round of small text corrections is included. Printing and installation are excluded. Delivery: five working days after final text approval.

Version 2 - Thursday

Base work: design two A2 noticeboard panels and supply print-ready files. Price: £410. Two rounds of small text corrections are included. Printing and installation remain excluded. Delivery: seven working days after final text approval.

Optional item in version 2

Printed panels: an additional £90 for both panels. This option is not included in the £410 base price. Installation is not offered. The client must confirm the printing option in writing.

Status and assumptions

This quotation replaces version 1. Prices assume the client supplies final text and photographs. A site visit is not included. Work will begin after written acceptance and receipt of the approved text.

Which changes explain the revised total?

The base price rises from £240 to £410, but the scope also changes from one panel to two. The revised offer adds a second correction round and a longer production period. Comparing only £240 and £410 would hide those differences. If the printing option is accepted, the stated combined cost becomes £500: £410 plus £90.

Quote language
PhraseRead it as
IncludedPart of the stated price.
ExcludedOutside the stated work or price.
Optional / additionalAvailable only if selected, at an extra cost.
Assumes the client suppliesA condition the supplier used to calculate the offer.
After final text approvalThe delivery clock starts at that later event.

An estimated delivery period is not automatically a date from the day the email arrives. Here, seven working days begin after approval. A client who has not supplied final text has not met that starting condition. Ask Could you confirm the delivery date if we approve the text on Monday? rather than announcing your own deadline.

Question 1No account needed
What is the stated cost if the client selects printing?

Choose one answer.

Answer and explanation

£500.. The optional £90 is added once to the £410 base price, giving £500.

Question 2No account needed
Which service is excluded from both versions?

Choose one answer.

Answer and explanation

Installation.. Both versions exclude installation, and the printing option does not add it.

Question 3No account needed
What starts the seven-working-day period?

Choose one answer.

Answer and explanation

Final text approval.. Version 2 explicitly measures delivery from final text approval, not receipt of the quotation.

Built from